Now that post and beams are up for the main floor, I can now start the second floor joists. Before I can do that, I should shore the main floor walls with sheathing. Since the front has a tall drop, I am going to frame in the porch for ease of access to the front.
Tuesday, August 30, 2022
Subscribe to:
Post Comments (Atom)
Front Door Entry Steps
This was my first attempt at gluing and clamping, to make large wood planks. I was surprised how easy it was, although I probably did not d...
-
This was my first attempt at gluing and clamping, to make large wood planks. I was surprised how easy it was, although I probably did not d...
-
The roof is undoubtedly the hurdle or the "Wednesday" of the cabin progress. It is the spendiest ticket item and largest turning ...
-
To steady up the walls before adding the next floor, I add sheathing which is 1/2 plywood to the walls, nailed on 6” centers. I went throug...