Electrical Trench

 To get temporary electrical at the property, the Skamania PUD requires underground installed at 3 feet depth. They also require a foot width which meant I had to excavate rather than run a trencher. This would be a new challenging experience for me.

The only way to get to the electrical pole was excavate between the gas and communication line. Yikes! I was able to do it without any tragedies though I did nearly topple the excavator a few heart stopping times as well as exposed the gas line. 


I started with the easy part where I had lots of space.

I had to build "lifts" for the mini excavator to reach across the culvert without tipping.

On the left side of this trench was a gas line, on the right was telecommunications

Success! PUD installed the temporary electrical without and complaints of my crooked excavation skills.



Front Door Entry Steps

 This was my first attempt at gluing and clamping, to make large wood planks. I was surprised how easy it was, although I probably did not d...