While working on the cabin, I was fortunate enough to be approached by a contractor looking for future work. I didn’t need his particular services at that time but he referred me to some framers. Within a day, I was able to set up them up to install the roof sheathing, a job way out of my reach. They were done in 5 hours and passed inspection the following morning. Stoked!
Wednesday, October 19, 2022
Subscribe to:
Post Comments (Atom)
Front Door Entry Steps
This was my first attempt at gluing and clamping, to make large wood planks. I was surprised how easy it was, although I probably did not d...
-
Sitting on top of the four posts is the ridge beam, consisting of two 2x12 LVL engineered wood connected together to make a 4x12 . I was ab...
-
Rather than trusses, I am using 2x12 boards 20 feet long as rafters. These bad boys are heavy and awkward. The first 2 took about 3 hours t...
-
Like the roof, I decided the eaves needed to be done by someone other than me. It is just too far off the ground and quality is critical. I ...
No comments:
Post a Comment